Mineral Resource upgrades are expected at DML's Boseto Copper Project throughout 2009

 To download the Investor Fact Sheet as a PDF click here.

Business Description

  • Discovery Metals (DML) consists of two mineral assets in Botswana (the Boseto copper project and the Dikoloti nickel project.)
  • DML is currently focussed on its activities on the 100% owned Boseto Copper Project in north-west Botswana .
  • The Boseto Project comprises fourteen prospecting licenses covering an area of over 10,100km2 within the Kalahari Copper Belt - a previously poorly explored extension of the Zambian Copper Belt.
  • DML has copper mineralisation of over 1,300km to explore of which less than 5% has been explored to produce the 102.8Mt resource.
  • Drilling has focused on three prospects, Zeta, Petra and Plutus, identifying a total indicated and inferred resource of 102.8 Mt @ 1.4% copper with 17.3 g/t of silver at a cut-off grade of 0.6% copper.
  • Bankable Feasibility Study formally commenced August 2008 and is:
    - Currently scheduled for completion in July 2010
    - Continuing infill drilling program to extend existing resources
    - Looking to source project financing early 2010 possibly through commercial banks, existing shareholders.
  • During the June quarter of 2009, DML secured additional funding via a share placement of 31.2m shares at $0.18 per share raising $5.6m UPDATE


  Name Position
  Management  
  Brad Sampson     Managing Director
  Paul Fulton     CFO
  Board of Directors  
  Gordon Galt Non Executive Chairman
  Brad Sampson     Managing Director
  Morrice Cordiner Non-Executive Director
  Ribson Gabonowe Non-Executive Director
  Jeremy Read Non-Executive Director
  John Shaw

Non-Executive Director

Description of Primary Assets

Boseto Copper Project (100%)

  • Located in north west Botswana, DML commenced a pre-feasibility study in August 2007 and announced the outcomes of the study in July 2008
  • Extended Pre-Feasibility Study update in January 2009. 
    - Open pit mine with 10 year mine life.
    - 2Mtpa conventional flotation concentrator (considering 3Mtpa).
    - Recoveries of 82.5% Cu and 60% Ag.
    - To produce 23.2kt Cu and 725koz Ag per annum (in concentrate)
    - Capex of US$131m and net cash cost US$1.06/lb
    - NPV of US$103m at a copper price of US$2/lb and US$218m at US$3/lb
  • Three strike zones containing 50.2Mt of Mineral Resources:
    - Zeta 25.2Mt @ 1.5% Cu and 20.1g/t Ag
    - Plutus 15.9Mt @ 1.6% Cu and 16.4g/t Ag
    - Petra 9.1Mt @ 1.2% Cu and 14.1 g/t Ag


Dikoloti Nickel Project

  • Located in north east Botswana.
  • DML has recently commenced joint exploration with the Japanese government agency JOGMEC.
  • Marginally economic using conventional processing techniques but heap leach bio-oxidation provides more feasible option.
  • Entire project is within 45km of BCL's concentrating and smelter facility, the largest nickel processing facility in Africa.
  • Resource of 4.1Mt @ 0.7% Ni, 0.5% Cu and 1.2g/t PGE.

 

  Market Capitalisation and Enterprise Value

Share price1 (A$/share) 0.75
Diluted shares (m) 301
Market Capitalisation 226
Net Debt/(cash) (A$m) (6)
Enterprise value (A$m) ##
Enterprise value (US$m) ##

Source: IRESS, company filings

Notes:
1. As of 31 May 2010 

Share Price Performance

 

updated graph
 

Reserves and Resources1

  Mt % grade (Cu equiv) Cu equiv (kt)
Measured
4.0 
1.8%
-
Indicated
18.5
1.4%
86
Inferred
80.3 
1.4%
714
Total resources
102.8
1.4%
 
Proven
-
-
-
Probable
-
-
-
Total Reserves
-
-
-

Major Shareholders

Rank
Name Shares (m) %
1.
Macquarie Bank 34.6  11.49
2.
Taurus Fund 33.3 11.08
3.
Transamine 25 8.3
4.
Citi Group Global Markets 21.2 7.06
5.
Investec 15.6  5.17
   6. BIFM 10.7 3.57
7.
RCF 8.5 2.83
Total
  148.9 49.5

Source: UBS Emerging ASX copper companies book 6 September 2009 with update by DML